AbouRizk, S M and Dozzi, S P (1993) Application of Computer Simulation in Resolving Construction Disputes. Journal of Construction Engineering and Management, 119(02), 355–73.

Barnes, W C (1993) Microcomputers in Management of Construction Operations. Journal of Construction Engineering and Management, 119(02), 403–12.

Bernold, L E and Salim, M (1993) Placement‐Oriented Design and Delivery of Concrete Reinforcement. Journal of Construction Engineering and Management, 119(02), 323–35.

Carr, R I (1993) Cost, Schedule, and Time Variances and Integration. Journal of Construction Engineering and Management, 119(02), 245–65.

East, E W and Kim, S (1993) Standardizing Scheduling Data Exchange. Journal of Construction Engineering and Management, 119(02), 215–25.

Ioannou, P G and Liu, L Y (1993) Advanced Construction Technology System—ACTS. Journal of Construction Engineering and Management, 119(02), 288–306.

McCullouch, B G and Gunn, P (1993) Construction Field Data Acquisition with Pen‐Based Computers. Journal of Construction Engineering and Management, 119(02), 374–84.

Miyatake, Y and Kangari, R (1993) Experiencing Computer Integrated Construction. Journal of Construction Engineering and Management, 119(02), 307–22.

Russell, A D (1993) Computerized Daily Site Reporting. Journal of Construction Engineering and Management, 119(02), 385–402.

Russell, A D and Wong, W C M (1993) New Generation of Planning Structures. Journal of Construction Engineering and Management, 119(02), 196–214.

Tommelein, I D and Zouein, P P (1993) Interactive Dynamic Layout Planning. Journal of Construction Engineering and Management, 119(02), 266–87.

Vanegas, J A, Bravo, E B and Halpin, D W (1993) Simulation Technologies for Planning Heavy Construction Processes. Journal of Construction Engineering and Management, 119(02), 336–54.

  • Type: Journal Article
  • Keywords: Computer aided simulation; Construction; Construction methods; Project management; Design;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(336)
  • Abstract:
    Heavy construction projects, such as dams and tunnels, closely integrate design and construction and require the project manager or the project engineer to be knowledgeable and familiar with: (1) Different types of heavy construction plant and equipment; and (2) different construction methods that may be applicable to a given project. However, to effectively define these two elements, different possible scenarios, under different conditions and constraints, must be explored with both a technology and process focus, and a resource use focus. This task requires the development of descriptive, analytical, and decision‐making models, which accurately represent and simulate these processes, and experimentation with different alternatives under different conditions. Until relatively recently, the analytical and operational tools that have been available to practitioners to achieve this, have been complex and difficult to learn and use. The Cyclic Operations Network (CYCLONE) microcomputer‐based simulation methodology presents a viable alternative to overcome these barriers. This paper describes the implementation of this system within the division of project planning and control of a large Spanish heavy construction firm, using two specific case‐study applications.

Yates, J K (1993) Construction Decision Support System for Delay Analysis. Journal of Construction Engineering and Management, 119(02), 226–44.